Oldonyo Rasha School & Community WASH Project

Litres of water abstracted
Villages Served
1102 People Reached
335 Learners Reached School WASH

Oldonyo Rasha Site Profile

Image

Oldonyo Rasha Primary School relied on rainwater harvesting, but storage tanks were insufficient and often ran dry. This left the school without water for weeks at a time. The surrounding community depended on water pans which often relied on rain water to collect water. Toilets at the school were inadequate in number and poorly maintained.

Water Interventions

  • Borehole Rehabilitation
  • Solarization with kWh Solar Panels
  • Water Kiosk Built & Equipped
  • Pipeline Extended
  • School Water Point Construted

Sanitation Interventions

  • null
  • villages declared ODF
  • 8 Toilets constructed in schools
  • 3 bathrooms constructed in schools
  • 16 handwashing stations equipped in schools

Site Layout.